Company:
Easy Skill
Location: Paris
Closing Date: 25/11/2024
Salary: £80 - £100 Per Annum
Type: Temporary
Job Requirements / Description
Location: Paris, France (Hybrid Office Set-up)
Project: Offshore Platform (Newly Built)
Stage: FEED Engineering
Region: Nigeria
Mobilization: April 2024
Duration: 8 months (renewable)
Our client: This company is recognized as one of the largest engineering firms globally, with its headquarters located in Paris, France. The company operates in various business sectors, including Technical Consultancy, Training/E-Learning, Engineering, and Data Management/Digitalization. They are proficient in a wide range of fields, including yard/offshore supervision, tools management, subsea integrity management, offshore transport and installation (method analysis), and many more.
Scope of Platforms:
1 Production Platform (PP) with capacity for 250MMscfd of gas, 20kbopd oil and condensate and 10kbwpd of water
1 Well Head Platform (WHP) with 12 slots bridge-linked to (PP)
1 Accommodation Platform (AP) for 60 POB bridged-linked to (PP)
Profile:
Experience as a senior or leader in O&G projects: 10 years minimum
Language: Fluent English; good written and verbal communication
Scope:
Will work under the supervision of the project manager
Will be the leader of the discipline for the project
Will prepare all documentation related to the project scope (refer to typical deliverable list)
Must be autonomous as no additional manpower in the project team
Will be in charge of:
Project planning and progress follow-up
Organization of meetings with client and internal stakeholders
Interactions with client and the project management
Coordination with other disciplines
Typical Deliverable List:
Safety Concept
Philosophies
Active and Passive Fire Protection
Fire and gas detection
Escape
Specifications:
Passive Fire Protection
Fire & Gas Detectors
Safety Equipment (Firefighting & Lifesaving)
Flooding system
Calculation Notes:
Safety Distances
Flammable and Toxic Gas Dispersion
Fire Water Demand
Foam Demand
Fire & Explosion Risk Analysis
Layouts:
Hazardous Area layouts
Escape routes
Safety Equipment layouts
Fire Zone / F&G Detector arrangement layouts
Lists:
Safety Equipment List
Hazardous Area Classification Schedule
Effluent List (Environment)
Process:
UFD - Firewater System
P&IDs for Firewater Network
Fire & Gas Logic Diagrams
Scope of Work for Safety studies:
Fire & Explosion Risk Analysis (FERA)
Noise Study
RAM Study
Reviews (Preparation, Participation and Reports):
HAZID
HAZOP for Firewater pumps
Standards:
Applicable regulations, codes of practice, international standards including 4th revision of EI15, NFPA 10 to 16, NFPA 2001, IEC 60079
Software:
PHAST (and Pipenet if possible)
3D Model:
Familiar with 3D model viewer software Autodesk - Naviswork
#J-18808-Ljbffr
Share this job
Easy Skill